Maintenance and control of the SE MAS FIGUERES
Iplan has participated in the maintenance of the MAS FIGUERES Electrical Substation thanks to the collaboration with the COMSA group. A Power and Control project has been carried out for the new Trafo position (TR4) and a study of the safety of its columns and girders.