SUBSTATION 110 / 25KV
The substation consists of two 110kV line positions, two 110 / 25kV 60MVA transformation positions and 10 25kV line cabinets to be able to carry out the distribution / power supply of all the distribution centers that are located inside the plant.
Iplan has drawn up the construction project, construction management and legalization of a hybrid type substation for the ICL Iberia plant located in the municipality of Súria.