• ES
  • CA
  • EN
Languages
  • CA
  • ES
  • EN
Login
Forgot?

Forget your password?
Remembered Password?
Subscribe
Please add MailChimp API Key in Theme Options > General Settings > API Integrations
gestión integral de proyectos gestión integral de proyectos gestión integral de proyectos gestión integral de proyectos
Vulcain
  • Iplan
    • Who are we?
    • Why us?
    • Certifications, Approvals and Associations
  • Services
    • Electrical Engineering and Consulting
    • Engineering, Civil Works and Building
    • Environmental Engineering and Renewable Energies
    • Engineering and Legalizations
    • Health and safety consulting
  • Press
  • Work with us
  • Contact us
  • Iplan
    • Who are we?
    • Why us?
    • Certifications, Approvals and Associations
  • Services
    • Electrical Engineering and Consulting
    • Engineering, Civil Works and Building
    • Environmental Engineering and Renewable Energies
    • Engineering and Legalizations
    • Health and safety consulting
  • Press
  • Work with us
  • Contact us

Archives

Monthly Archive for: "January, 2021"
Portada » Archivos por January 2021
SE FORALLAC 110/25 kV
0
By maria alejandra hoffmann
In Engineering and Legalizations, LEGALIZATIONS- LEGAL ADVICE, Portada EN
Posted 29/01/2021

SE FORALLAC 110/25 kV

Legal advice specialized in urban planning law, in administrative and contentious administrative proceedings, followed in the legal procedure aimed at the implementation of the SE Forallac [...]

READ MORE
ELECTRIC INTERCONNECTION SPAIN-FRANCE. SANTA LLOGAIA UNDERGROUND LINE- FRENCH BORDER
0
By iPlan
In Sin categoría
Posted 29/01/2021

ELECTRIC INTERCONNECTION SPAIN-FRANCE. SANTA LLOGAIA UNDERGROUND LINE- FRENCH BORDER

ELECTRIC INTERCONNECTION SPAIN-FRANCE. SANTA LLOGAIA UNDERGROUND LINE- FRENCH BORDER Iplan has managed both the legalization and expropriation for the commissioning of the electrical [...]

READ MORE
HEALTH AND SAFETY COORDINATION OF THE WORKS RELATED TO THE EXECUTIVE PROJECT OF THE PLÇA. SOLLER REURBANISATION (F1) IN PORTA NEIGHBOURHOOD, IN THE NOU BARRIS DISTRICT OF BARCELONA
0
By maria alejandra hoffmann
In health and safety consulting, HEALTH AND SAFETY COORDINATIONS AND PREVENTION TECHNICAL ASSISTANCE
Posted 25/01/2021

HEALTH AND SAFETY COORDINATION OF THE WORKS RELATED TO THE EXECUTIVE PROJECT OF THE PLÇA. SOLLER REURBANISATION (F1) IN PORTA NEIGHBOURHOOD, IN THE NOU BARRIS DISTRICT OF BARCELONA

Health and Safety coordination in the Plaza Soller redevelopment (PHASE 1 ), in the Porta neighbourhood in the Nou Barris district of Barcelona, ​​which included both civil works and [...]

READ MORE
HEALTH AND SAFETY COORDINATION IN THE WORKS OF THE SUPPLY AND ASSEMBLY OF A CATALYTIC SYSTEM FOR NITROGEN OXIDES REDUCTION PROJECT
0
By maria alejandra hoffmann
In health and safety consulting, HEALTH AND SAFETY COORDINATIONS AND PREVENTION TECHNICAL ASSISTANCE
Posted 25/01/2021

HEALTH AND SAFETY COORDINATION IN THE WORKS OF THE SUPPLY AND ASSEMBLY OF A CATALYTIC SYSTEM FOR NITROGEN OXIDES REDUCTION PROJECT

Health and Safety Coordination in the works for a catalytic system for nitrogen oxides reduction installation, at the TERSA plant in St. Adrià del Besós.

READ MORE
HEALTH AND SAFETY COORDINATION IN THE WORKS OF THE NEW TRAMER FACILITIES IN THE PORT OF BARCELONA
0
By maria alejandra hoffmann
In health and safety consulting, HEALTH AND SAFETY COORDINATIONS AND PREVENTION TECHNICAL ASSISTANCE
Posted 25/01/2021

HEALTH AND SAFETY COORDINATION IN THE WORKS OF THE NEW TRAMER FACILITIES IN THE PORT OF BARCELONA

Health and Safety Coordination of the works for the potash mega warehouses construction, with a mixed concrete and metal structure, and all its auxiliary infrastructures (road and rail accesses, [...]

READ MORE
HEALTH AND SAFETY STUDY DRAFTING FOR COMPREHENSIVE MAINTENANCE SHUTDOWN WORK 2020, WASTE VALORIZATION PLANT, PROPERTY OF TERSA, IN SANT ADRIÀ DE BESÓS
0
By maria alejandra hoffmann
In health and safety consulting, health and safety consulting sub
Posted 25/01/2021

HEALTH AND SAFETY STUDY DRAFTING FOR COMPREHENSIVE MAINTENANCE SHUTDOWN WORK 2020, WASTE VALORIZATION PLANT, PROPERTY OF TERSA, IN SANT ADRIÀ DE BESÓS

Analysis of all the risks related to the different and multiple tasks to be carried out during maintenance work in an industrial waste recovery plant, during which it was expected that around 300 [...]

READ MORE
HEALTH AND SAFETY STUDY DRAFTING FOR THE MUNTANYES DE BURGANS 1 WIND PARK PROJECT
0
By maria alejandra hoffmann
In health and safety consulting, health and safety consulting sub
Posted 25/01/2021

HEALTH AND SAFETY STUDY DRAFTING FOR THE MUNTANYES DE BURGANS 1 WIND PARK PROJECT

Analysis of the associated risks analysis and the minimum measure definition to be taken into account in the construction of a wind power plant.

READ MORE
HEALTH AND SAFETY STUDY DRAFTING FOR THE 49MW GALATEA WIND PARK PROJECT (EVACUATION AND SUBSTATION LINE).
0
By maria alejandra hoffmann
In health and safety consulting, health and safety consulting sub
Posted 25/01/2021

HEALTH AND SAFETY STUDY DRAFTING FOR THE 49MW GALATEA WIND PARK PROJECT (EVACUATION AND SUBSTATION LINE).

Its purpose is to define and coordinate the health and safety measures to be taken into account during the development of all the work necessary for the installation of wind power plant.

READ MORE
TECHNICAL ASSISTANCE
0
By maria alejandra hoffmann
In Consulting, Electrical engineering and consulting
Posted 25/01/2021

TECHNICAL ASSISTANCE

Technical assistance for the integration of flotation and wet grinding processes new technologies of the ICL Iberia mining plant in the municipality of Súria.

READ MORE
TECHNICAL STUDY AND CONSULTANCY FOR THE IMPLEMENTATION OF THE RD244 SELF-CONSUMPTION CRITERIA
0
By maria alejandra hoffmann
In Consulting, Electrical engineering and consulting
Posted 25/01/2021

TECHNICAL STUDY AND CONSULTANCY FOR THE IMPLEMENTATION OF THE RD244 SELF-CONSUMPTION CRITERIA

Technical study and consultancy for the criteria fulfillment demanded by the RD244 of Self-consumption without surpluses, for the Implementation within the Electrical facilities of all the [...]

READ MORE
1 2 3 4 5
page 1 of 5
IPLAN

Who are we?
Why us?
Certifications

Part of:
Vulcain

SERVICES

Electrical Engineering and Consulting
Engineering, Civil Work and Building
Environmental Engineering and Renewable Energies
Engineering and Legalizations
Health and Safety Consulting
CONTACT

Offices
Work with us
Ethics and complaints channel
PRESS

News
Social network
© 2023 Legal Advice - Privacy Policy

Start typing and press Enter to search

COOKIES CONSENT
We use cookies to ensure that we give the best user experience on our website. You can view our cookie policy by clicking on the link.
Functional Always active
The technical storage or access is strictly necessary for the legitimate purpose of enabling the use of a specific service explicitly requested by the subscriber or user, or for the sole purpose of carrying out the transmission of a communication over an electronic communications network.
Preferencias
The technical storage or access is necessary for the legitimate purpose of storing preferences that are not requested by the subscriber or user.
Statistics
The technical storage or access that is used exclusively for statistical purposes. The technical storage or access that is used exclusively for anonymous statistical purposes. Without a subpoena, voluntary compliance on the part of your Internet Service Provider, or additional records from a third party, information stored or retrieved for this purpose alone cannot usually be used to identify you.
Marketing
The technical storage or access is required to create user profiles to send advertising, or to track the user on a website or across several websites for similar marketing purposes.
  • Manage options
  • Manage services
  • Manage {vendor_count} vendors
  • Read more about these purposes
Preferences
  • {title}
  • {title}
  • {title}